How much gravel for a 12 × 50 driveway?
A 12 × 50 ft driveway is 600 sq ft. With 4 in of clean crushed stone and 10% extra you need 10.6 tons (8.15 cubic yards). With 4 in of crusher run it is 15.2 tons, because crusher run packs denser.
Last reviewed November 28, 2026 · How we check the numbers
| Layer | Tons | Cubic yards |
|---|---|---|
| 4 in crushed stone | 10.6 | 8.15 |
| 6 in crushed stone | 15.8 | 12.22 |
| 4 in crusher run | 15.2 | 8.15 |
| 6 in crusher run | 22.8 | 12.22 |
Clean crushed stone at 96 lb per cu ft, crusher run at 138 lb per cu ft (Vulcan Materials typical figures). Your quarry’s stone may differ by about ±10%.
Change the size or depth
The calculator is filled in for this job. Change any number, add another area or enter your local prices.
Result
- Weight to order
- 10.56 tons
- Volume with 10% extra
- 8.15 cubic yards (220 cu ft)
- Weight used for one cubic yard
- 1.3 tons
- In pounds
- 21,120 lb
- Area
- 600 sq ft
- One ton covers
- 63 sq ft at this depth
- Or 0.5 cu ft bags (small jobs)
- 440
An estimate for buying materials, not a substitute for plans.
Link copied
Full explanation, mistakes to avoid and more examples: Gravel calculator.
Frequently asked questions
How many tons of gravel for a 12 × 50 driveway?
About 10.6 tons of crushed stone at 4 in deep and 15.8 tons at 6 in, with 10% extra.
How many cubic yards of gravel for a 12 × 50 driveway?
8.15 cubic yards at 4 in and 12.22 at 6 in, with 10% extra.
How deep should driveway gravel be?
The depth depends on your soil and traffic; a local supplier or contractor can tell you what works in your area. Driveways are often built in layers — a compacted base of crusher run under a top layer of clean stone — so calculate each layer separately.